SYS-258 · SYSTEM

FSRU regasification and high-pressure send-out system

FSRU 재기화·고압 송출 시스템

The plant that turns an LNG carrier hull into an import terminal: seawater-heated vaporizers convert the liquid back to gas and send it ashore at pipeline pressure.

Public record ID
SYS-258
Released Component records
6
Evidence state
Reference taxonomy — not project verified

SYSTEM CONTEXT

Family reference-profile markers
0 Standard · ○ 1 Common · △ 1 Variant · 19 unmarked
Component coverage
6 released source-BOM records
Relationship meaning
Family markers describe reference applicability. Component links are released source-BOM listings and do not assert complete engineering containment.

FAMILY REFERENCE APPLICABILITY

Family profiles carrying a source marker.

Unmarked Families are not listed; an unmarked cell means “not normally fitted” in the source Family profile, not confirmed absence from a vessel.

RELEASED SOURCE-BOM LISTING

Released Component records.

Coverage is partial and Family-independent: selecting a Family does not alter the Component records linked to this System.

COMP-821 · Pump

LNG high-pressure send-out pumps

LNG high-pressure send-out 펌프

Pumps raising liquid LNG to pipeline pressure before it is vaporised for shore delivery.

Design dependent · As required / design dependentView Component record →
COMP-822 · Heat exchanger

Regasification vaporizers

재기화 기화기

The exchangers converting high-pressure liquid LNG into natural gas, usually heated by seawater.

Design dependent · As required / design dependentView Component record →
COMP-823 · Unit / Skid

Heating-medium / seawater circulation package

열매체·해수 순환 패키지

The circulation supplying the heat the vaporizers need — very large flows, since the process is a huge heat demand.

Design dependent · As required / design dependentView Component record →
COMP-824 · Valve

Gas pressure-regulation skid

가스 압력 조절 스키드

The skid delivering gas at exactly the pressure the shore pipeline requires.

Design dependent · As required / design dependentView Component record →
COMP-825 · Instrument / Sensor

Send-out metering system

송출 계량 시스템

The fiscal meters recording how much gas is sent ashore — the terminal's commercial output.

Design dependent · As required / design dependentView Component record →
COMP-826 · Panel / Electronics

Process control and ESD

Process 제어 and ESD

The control and shutdown system for the regasification plant, treating it as the terminal process it is.

Design dependent · As required / design dependentView Component record →